- kW = kilowatt
- Single phase service
General Service Below 25 kW (PDF)
- Single phase service must not exceed 25kW
General Service Above 25 kW (PDF)
- Single phase service in excess of 25kW
Agriculture Service Below 25 kW (PDF)
- Single phase service must not exceed 25kW
- Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying service that is not residential or agriculture in nature
Agriculture Service Above 25 kW (PDF)
- Single phase service in excess of 25kW
- Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying service that is not residential or agriculture in nature
- Distributed generation purchase tariff
- Three phase service below 100 kW
- Three phase service above 100 kW and below 500 kW
- Three phase service below 100 kW
- Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying required service that is agriculture in nature
- Three phase service above 100 kW and below 500 kW
- Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying required service that is agriculture in nature
- Security Lighting
- Redundant capacity "standby" rate schedule
- Power and fuel cost adjustment
- Miscellaneous and nonrecurring charges
- Deposits to insure payment of bills
- Demand Tracker