Rates
SINGLE PHASE SERVICES:
- Single phase service.
- Single phase service must not exceed 25kW.
- Single phase service in excess of 25kW.
AGRICULTURE SERVICE BELOW 25kW
- Single phase service must not exceed 25kW. Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying service that is not residential or agriculture in nature.
AGRICULTURE SERVICE ABOVE 25kW
- Single phase service in excess of 25kW. Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying service that is not residential or agriculture in nature.
- Distributed generation purchase tariff.
THREE PHASE SERVICES:
- Three phase service below 100kW.
- Three phase service above 100kW and below 500kW.
- Three phase service below 100kW. Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying required service that is agriculture in nature.
- Three phase service above 100kW and below 500kW. Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying required service that is agriculture in nature.
OTHER:
- Security lighting.
- Redundant capacity "standby" rate schedule.
APPENDIX:
- Power and fuel cost adjustment.
- Miscellaneous and nonrecurring charges.
- Deposits to insure payment of bills.
- Demand Tracker.