- Single phase service
General Service Below 25 kW (PDF)
- Single phase service must not exceed 25kW
General Service Above 25 kW (PDF)
- Single phase service in excess of 25kW
Agriculture Service Below 25 kW (PDF)
- Single phase service must not exceed 25kW
- Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying service that is not residential or agriculture in nature
Agriculture Service Above 25 kW (PDF)
- Single phase service in excess of 25kW
- Service location must be adjacent to a distribution line of the REMC that is adequate and suitable for supplying service that is not residential or agriculture in nature
- Distributed generation purchase tariff